Skip to product information
1 of 6

Vesgantti Small 2 Seater Sofa Blue, Comfy Sofa Couch with Spring Cushion, Velvet Sofa with Wood Legs, Modern Love Seat Sofa, Sofa 2 Seater for Living Room, Small Sofa for Bedroom, Blue Office Sofa

Vesgantti Small 2 Seater Sofa Blue, Comfy Sofa Couch with Spring Cushion, Velvet Sofa with Wood Legs, Modern Love Seat Sofa, Sofa 2 Seater for Living Room, Small Sofa for Bedroom, Blue Office Sofa

Regular price £2,339.76 GBP
Regular price Sale price £2,339.76 GBP
Sale Sold out
Taxes included.
Quantity
  • Spring Packs Cushion - This sofa couch provides support and a cushioned feel, which improves the overall comfort of the sofa. Springs help absorb the impact of repeated use and prevent the cushions from deteriorating quickly. This extends the life of the small sofa and reduces the need for frequent replacements
  • High Resilience Foam - This love seat sofa with premium foam provides a comfortable sitting experience and stable support for your body. The high resilience means it can withstand repeated use, retaining its shape and support properties over time, even if you sit and lie down a lot
  • Solid Sofa Frame - Our 2 seater sofa frames are made from high-quality, sturdy wood, which is less likely to warp or crack over time. Also there are non-slip pads on the bottom of the legs to prevent the velvet sofa from slipping or hurting the floor. With a maximum weight capacity of 400KG, it is perfectly suitable for home and business
  • Velvet Luxury Texture - Known for its soft, plush texture that feels luxurious to the touch. High-quality velvet fabrics are abrasion and pilling resistant, maintaining their luxurious look even with frequent use. This sofa is made of special double-sided velvet fabric, the different direction of the fabric will show different colours. In addition, by the different light and monitor will be slightly colour difference, the sofa picture has been as far as possible to restore the most real colour
  • Enjoying Leisure Time - Easily assembled in 4 steps, (recommended for 2 people) you can set up this mini sofa in just 10 mins. Please be careful not to scratch the sofa when you open the vacuum package. Cushions take 24-48 hours to fully recover due to compressed packaging. So it is not so fluffy and comfortable when you just unpacked it, you can pat the cushion to make it fluffy and feel better
  • View full details