Skip to product information
1 of 6

Vesgantti Folding Mattress Single Size with Storage Bag, 15CM Gel Memory Foam Foldable Mattress Tri-fold for Travel, Camping, Guest Bed - 100-Night Trial, CertiPUR-US Certified

Vesgantti Folding Mattress Single Size with Storage Bag, 15CM Gel Memory Foam Foldable Mattress Tri-fold for Travel, Camping, Guest Bed - 100-Night Trial, CertiPUR-US Certified

Regular price £178.69
Regular price Sale price £178.69
Sale Sold out
Taxes included.
Quantity
  • 【Multifunctional Design】Vesgantti tri-fold mattress is the ideal solution for temporary sleeping accommodation. When not used for sleep, it can be folded into a sofa position, which is very suitable for reading or playing games. Whether it is for guests staying, camping, traveling, yoga, and video gaming, Vesgantti folding mattress is your ideal choice
  • 【Portable & Easy to Store】The mattress can be folded into a compact shape in seconds for space-saving when not in use and it can be easily stored in the trunk of your car or under your bed. We also provide you a durable storage bag so you can keep the mattress neat and secure during storage and transport
  • 【Superior Support & Comfort】Made of premium CertiPUR-US Certified foam, this mattress features a 2-Layer design that includes 3cm gel-infused memory foam and 12cm high-density base foam. The gel memory foam can effectively relieve your body pressure, and give you a cooling and cloud-like sleep experience; The high density support foam gives your body perfect support from head to toe
  • 【Breathable & Washable Cover】The breathable cover is made of skin-friendly knitted fabric, which can absorb sweat and dry quickly, keeping cool after you sleep for a long time. The non-slip cloth at the bottom can prevent sliding during use. Coming with the smooth zipper, the cover of our tri-fold mattress can be quickly removed for easy washing
  • 【Instructions & Service】Vesgantti folding mattress is compressed rolled, and you can easily move it and set it up in your room. It will inflate right after unpacking but please allow 24-48 hours for it to fully expand (Memory foam will expand faster in a warmer room. In cold temperatures, your mattress may take a bit longer to return to full size). If you are not satisfied for any reason, please do not hesitate to let us know
  • View full details