Skip to product information
1 of 5

Vesgantti 16CM Ocean-Inspired Memory Foam Mattress - Single, Medium

Vesgantti 16CM Ocean-Inspired Memory Foam Mattress - Single, Medium

Regular price £103.40
Regular price Sale price £103.40
Sale Sold out
Taxes included.
Quantity

Vesgantti 16CM Ocean-Inspired Memory Foam Mattress - Single, Medium

OCEAN-INSPIRED WASHABLE COVER: Dive into a bedroom refresh with our new premium fabric cover, featuring playful whale patterns and flowing wave lines that bring the ocean's vitality indoors. As always, the cover zips off easily for quick washing to keep your mattress fresh for cozy nights

BALANCED COMFORT & SUPPORT: Experience the comfort you love, with a gel memory foam layer that contours to your body, easing pressure points and balancing temperature for restful nights. Supported by high-density foam, it delivers stable, uninterrupted sleep - now wrapped in a fresh ocean-inspired design to bring new energy to your bedroom

ENHANCED BREATHABILITY: Designed for a cooler sleep experience, this mattress features 3D breathable mesh fabric along the border that boosts airflow throughout the entire mattress. This strategic ventilation works with the gel memory foam's temperature-regulating properties to prevent overheating, keeping you comfortable all night long

HEALTHY & WORRY-FREE SLEEP: Vesgantti memory foam mattress is CertiPUR-US and OEKO-TEX STANDARD 100 certified - free of harmful chemicals, safe for you and your family. For total peace of mind, we back it with a 100-night trial and 10-year support to ensure lasting comfort

MATTRESS-IN-A-BOX: Your new mattress arrives conveniently compressed, vacuum-sealed, and rolled neatly in a box - easy to move. It fits most bed frames: bunk beds, twin beds, box springs, foundations and slatted patfroms. Let it expand 48-72 hours, and you'll be sinking into that best night's sleep

View full details