Skip to product information
1 of 1

20 Meter Long Lead

20 Meter Long Lead

Regular price £30.00
Regular price Sale price £30.00
Sale Sold out
Taxes included.
Quantity

This 20 Meter Long Lead is designed with reflective material for increased visibility and is made with strong, durable materials for long-lasting use. Ideal for long walks or training sessions, this lead provides both safety and convenience for you and your pet.

Why we like it

  • Designed for dogs
  • From the The North East Pet Shop range

Product details

  • Brand: The North East Pet Shop
  • Suitable for: Dogs
  • Product type: Dog Harnesses

Sizing & fit

Check the manufacturer’s sizing guidance before ordering. Adjust for a secure, comfortable fit without restricting normal movement, and inspect straps, fastenings and fittings regularly.

Good to know

  • Measure before ordering where sizing applies
  • Recheck the fit regularly as your pet grows or changes shape
Check in-store availability
Website and Hebburn-store stock levels can differ. If you are making a special trip for a particular item, please WhatsApp us or email us first so we can confirm availability.
View full details